PERMITS REQUIRED

Overview

Permits that are required include, but are not limited to,

  • Building

  • Demolition

  • Fences

  • Garages and carports

  • HVAC

  • Remodeling

  • Roofing

  • Sewer and water

  • Sheds

  • Electrical

  • Signs

  • Swimming pools / spas

    CLICK HERE TO VIEW PERMITS

Required Inspections after Permit Approval

The permit holder will be required to notify the Zoning Department on each of the required inspections and will give at least 24 hours notice prior. Call 217-935-6552 to set up an inspection.

  • Footing – Foundation Inspection, prior to backfilling the outer perimeter

  • Framing – Prior to concealing with insulation and drywall

  • Plumbing Inspection – Prior to concealment or covering

  • Electrical Inspections – Prior to concealing with insulation and drywall

  • Final Inspection – After construction is completed, prior to occupancy

Other inspections may be required as needed.